08-12-24 21:00

DCS Dispatched to HYH Unit 1

 [2011-03-08]

On March 7th 2011, LOT3 of DCS equipments for LHNP Unit 1 was dispatched from CTEC’s Yongfeng factory. Until now, all DCS equipments for the unit have been successfully delivered to the customer. Shi Liangmin, Vice GM of Liaoning Hongyanhe Nuclear Power Co., Ltd. (LHNP), Zhang Ruiqiong, Vice GM of PSE, China Nuclear Power Engineering Co., Ltd. (CNPEC), Hao Zhijian, GM of CTEC, and Shuichi Kobashi, Nuclear Power Department Manager of Mitsubishi Electric Co., Ltd. (MELCO) attended the delivery ceremony held in Beijing.

LHNP is the first nuclear power project in the 11th Five Year Plan. It is approved by the central government for the first time to build four 1000MWe class CPR1000 units at the same time and becomes the very first nuclear power station built in northeast China. The DCS equipments for the 4 units were supplied by the CTEC and MELCO team, for unit 3 and 4 CTEC acted as the team leader. As the last batch of DCS equipments for Unit 1, it will be installed soon on site. Besides LOT3 for Unit 1, LOT1 for both Unit 2 and 3 has already finished FAT and been dispatched to the customer. Remained equipments now are being designed and assembled.

News Center

XML 地图 | Sitemap 地图