08-12-24 21:00

CTEC Contributed to Yangjiang Unit 1 Cold Test

 [2013-04-02]

 

At 1:00am of Mar 31st, the primary circuit pressure of Yangjiang Unit 1 reduced to atmospheric level and the pressurizer exhaust valve opened, which marked the success of the cold test. It was the forth CPR1000 unit having passed the cold test following Hongyanhe Unit 1&2 and Ningde Unit 1. CTEC ensured no problems caused by the DCS equipments during the cold test process.

 

 

News Center

XML 地图 | Sitemap 地图